Pre-engineered metal buildings use a combination of: Structural steel framing system Metal roofing system Wall panels of varying materials

Progress Dynamics (Pvt) Ltd.

Pre-Engineered Building

WHY PRE-ENGINEERED BUILDING?

1. TIME REDUCTION:

Buildings are typically delivered in just a few weeks after approval of drawings. Foundation and anchor bolts are cast parallel with finished, ready for the site bolting. In India the use of PEB will reduce total construction time of the project by at least 50%. This also allows faster occupancy and earlier realization of revenue.

2. LOWER COST:

 Due to the systems approach, there is a significant saving in design, manufacturing and on site erection cost. The secondary members and cladding nest together reducing transportation cost.

3. FLEXIBILITY OF EXPANSION:

Buildings can be easily expanded in length by adding additional bays. Also expansion in width and height is possible by pre-designing for future expansion. Larger Spans: Buildings can be supplied to around 80M clear spans.

4. LOW MAINTENANCE COST:

 Buildings are supplied with high quality paint systems for cladding and steel to suit ambient conditions at the site, which results in long durability and low maintenance costs.

5. ARCHITECTURAL VERSATILITY:

 Building can be supplied with various types of fascias, canopies, and curved eaves and are designed to receive pre-cast concrete wall panels, curtain walls, block walls and other wall systems.